Planning

TSI can prepare studies for potential broadcast transmision facility locations that would best cover the intended TV/Radio households. Subsequently, actual site selection are done to determine technical feasibility for the project. Frequency studies are prepared to ensure that channel / frequency selection will not cause undue interference to other broadcast entities servicing the identified areas.

The technical feasibility study includes the following proposals:
• Site/Location plan
• Frequency Study
• NTC permit application assistance
• Predicted coverage study
• TV/Radio household reach
• Transmitter and antenna system
• Transmitter building elevations/floor plan
• Antenna tower
• Electrical / Mechanical system